 3. Sector Coordination, Capacity Development and ODF Campaign-SGL-38 in NUWAKOT 

Funding Agency
Global Sanitation Fund/UN HABITAT
Duration
July  2015 to September 2016
Budget
NRs 1,31,22,248.00
Project Site
Nuwakot District
Target Beneficiaries
*   17 VDCs and 11 Wards of Bidur Municipality
Project Objectives
* To build the capacity of D-WASH-CC, V-WASH-CC, W-WASH-CC, and stakeholders
*     To support in formulation district and VDC level strategic plans. 
*    To bring behavioural changes in school and communities for hand washing with soap, sustainable use of toilets and adoption of proper hygiene behaviours.
*    To strengthen monitoring and knowledge management systems.
Major Project Activities
*     Promotion of Sector Coordination and Planning
*  School level capacity development for triggering behavior change, communication and monitoring
*      Conduction of Open Free Defecation Campaign (ODF)

  4.Sunaula Hazar Din- Community Action for Nutrition Project (Golden 1000 Days)

Funding Agency
Ministry of Federal  Affairs and Local Development (MoFALD/World Bank) 
Duration
February 2015 to July 2017
Budget
NRs 4,87,49,330.00
Project Site
106 VDCs of Bara, Makawanpur, Parsa, Rautahat and Sarlahi
Target Beneficiaries
*       Girls and young women between 15 and 25 years of age;
*       Pregnant women and women who may want to become pregnant in the next 6    months;
*       Children 0-6 months of age and their caretakers;
*       Children 6-24 months of age and their caretakers; and
*       Communities involved in community-wide nutrition related interventions (such     as hygiene, safe drinking water, sanitation, etc.).
Project objectives
*     To improve attitudes and practices known to improve nutritional outcomes of   women of reproductive age and children under the age of 2
Major Project Activities
*    Review the SHD project Operational Manual and Guideline, and other relevant documents and reports
*  The coaches have to help communities deliver all project activities that are referred in SHD Guideline and Manual at the village. If the coaches required some technical backstopping while implementing the project activities the NGO(s) should provide help liaising with the Project Management team and LGCDP Cluster Coordination Unit.
*   The NGO(s) should continuously oversee the delivery of project activities and take full responsibility of the project ensuring a quality delivery. 
*    Select the qualified coaches for the assigned VDCs and districts. The coaches should be the residents of the assigned VDCs with prescribed qualification referred in the Operation Manual. Normally one coach per VDC will be selected, but before going to selection process Project Management Team and respective District Development Committee (DDC) shall be consulted. The coaches will be hired in two phases as per the VDCs selected by the Ministry.

5. Promotion of Improved Cooking Stove (ICS) for Hotels in Prithivi Highway Corridors 

Funding Agency
UNDP Global Environment Facility Small Grants Program (GEF/SGP) 
Duration
May 2015 to February 2016
Budget
NRs. 25,00,000.00
Project Site
Prithivi Highway Corridors of Chitwan and Dhading
Target Beneficiaries
 Hotels of Prithivi Highway Corridor 
Project objectives
*     To promote commercially viable ICS for the hotels along the Prithivi Highway for healthy life, energy saving, carbon emission control and protect environment
*   To Increase awareness of hotel entrepreneurs and workers on environment conservation, impact of indoor pollution, climate change mitigation measures and environment friendly methods of hotel operation.
*     To provide alternative livelihood options for the poor people involved in supply of firewood.
Major Project Activities
*  Preparation of hotel profiles, focus group discussions, selection of hotels, collection of demands, coordination and linkages with stakeholders, formation of ICS users groups, community level planning of ICS installation, finalization of co-financing, participatory monitoring, etc.
*  Training: Selection of trainee (field promoters and technicians), training on installation and operation & maintenance of ICS, Distribution of spares and equipments.
*   Installation: Install different sizes of tested ICS in the hotels. Carry out post-installation follow-up to ensure the efficiency, durability and product design. 

 6. Local Goverance and Community Development Programme (LGCDP) in KAVRE

Funding Agency
District Development Committee (DDC), Kavre
Duration
Jyly 2015 to July 2016
Contract Date
August 2015
Project Budget
NRs. 3,39,000.00
Project Site
9 VDCs of Kavre District (Cluster IV)
Target Beneficiaries
Wards Disadvantages' Family
Project Objectives
Promotion of Local Good Governance and Increased Access of the Weaker Society
Major Activities
Organization/group formation, capacity development, facilitation in program planning, technical assistance, coordination and linkages, etc.

  7.  Poverty Alleviation through Livelihood Promotion & Rural Infrastructure Development in PYUTHAN 

Funding Agency
Poverty Alleviation Fund (PAF), Kathmandu
Duration
July 2014 to July 2015
Budget
NRs. 16,66,709.00
Project Site
Seven VDCs of Pyuthan distict (Lung, Bangeshal, Pholi, Ligha, Damri, Khawang, Syaulibang VDCs)
Target Beneficiaries
Ultra poor groups form dalit, ethnic, marginalized and vulnerable communities, poor women. A total of 21,531 families will be benefited from the project.
Project Objectives
To increase annual income for helping them to escape form below poverty line.
Project Component
Social mobilization, revolving fund management, infrastructure development, income generation/micro-enterprise promotion and capacity development.
Major Project Activities
*    Institutional development, capacity development, promotion of micro-enterprises  for community organization, networks and cooperatives.
*    Provide technical support for income generation and enterprise development.
*  Facilitate to mobilize revolving fund, enterprise promotion, mobilization and  development of local resource persons and help in strengthening COs, VDC      network and cooperative.
*    Develop and promote pocket area.
*    Promote sanitation, environment conservation, food and nutrition security related  awareness and methods.

  8.Enhance Access to Market and Micro Enterprise for Poverty Alleviation in PARSA 

Funding Agency
Poverty Alleviation Fund (PAF), Kathmandu
Duration
July 2014 to July 2015
Budget
NRs. 12,61,064.00
Project Site
Three VDCs (Alau, Lalparsa and Lakhanpur) and 19 wards of Birgunj Sub-metropolitan City.
Target Beneficiaries
Dalit, ethnic, marginalized Madhesi, Muslim, Poor women (5,688 families)
Project objectives
Improve socio-economic status of dalit, ethinic, madhesi & poor women
Major Project Activities
*       Social mapping, well-being ranking, selection of target beneficiaries,
*       Formation of COs, registration in PAF, orientation and mobilization
*       Help to operate band accounts of PAF
*       Help to prepare community action plan
*       Help to adopt VDC vision plan
*    Carry out pre-feasibility and feasibility study of different income generation,      enterprise development and socio-economic infrastructures based sub-projects   including community action plan and submit in PAF for approval and funding.
*       Help COs to implement income generation and infrastructure sub-projects
*       Facilitate in institutional development, capacity development and new          enterprise selection through social mobilization activities.
*       Provide/ mobilize technical backstopping for enterprise operation.
*       Mobilize revolving fund, local resource persons and develop key strategies for    livelihood promotion and enterprise management.